Hello All,
I want to know if we can stack or perfom virtual chassis between two EX9208 switch, or its on the roadmap. And if we can, then how can we do that ?
Some documents say that we can do that via the reduntant routing engins. (http://www.juniper.net/documentation/en_US/junos/topics/task/configuration/virtual-chassis-ex9200-configuring.html )
and some say we can do that via VCP for example, configure SFP+ on both switches to perfome LAG bundle and total bandwidth of 20GE. ( http://www.juniper.net/techpubs/en_US/junos/information-products/pathway-pages/ex9200/virtual-chassis-ex9200.html )
So please tell me where to go ASAP, because I have a meeting with a customer who is willing to buy, and we stopped them and trying to push Juniper.