Hi,
I am looking into turning an EX3300 switch into a Virtual Chassis with 2 additional switches, making it 3 switches all together.
I've found many articles online explaining how to do this however I cannot find whether it requires downtime on the switch that currently exists?
Can someone advise whether when configuring the active switch into a Virtual Chassis master, does this require downtime?
I know adding additional switches to an existing VC does not require downtime, but not sure if when setting up a new VC.
Thank you,
Vishal